What problems should be paid attention to before installing the screw press?

time:2023-06-29 10:20:42hit:138

Screw press

What problems should be paid attention to before installing the screw press?




1. Before the screw press is installed, it is necessary to drill a few holes on the cement floor to facilitate the later fixing of the equipment. When punching holes, you need to know the model of the purchased equipment, and punch holes according to the corresponding model.




2. After the equipment is placed, it is necessary to weld the bracket and the parts embedded in cement to further fix the kitchen waste compactor.




3. After installation, it is necessary to add lubricating oil to the equipment, run it empty, and check whether there are any parts of the equipment that cannot work normally. If there is any problem, it should be adjusted in time.




4. After adjusting everything, normal filling operation can be carried out, expert observation is required when starting the operation, and stop inspection immediately when an accident occurs.




5. In addition to the above, the equipment also needs to be checked regularly.




The screw press is used for juice dehydration with certain fiber materials, such as fresh grape pomace (broken juice separation), fermented grape pomace, seabuckthorn fruit and other vegetable juice, fermented wine residue, cassava residue, dehydration of traditional Chinese medicine residue, and Herbs are used as raw materials for chemical pulp and other liquid extraction and for washing and dehydration in the process of material production. In addition, the equipment is also widely used in sludge dewatering, garbage disposal, etc.


The screw press is a solid-liquid separation equipment for extrusion dehydration of various waste residues composed of feed bins. .Squeezing screw type. Spiral seamless steel pipe. Slag discharge pipe and controller equipment. The slag to be processed enters the spiral seamless steel pipe from the feed bin, and is extruded and dried under the action of the extrusion screw. The water squeezed out of the raw materials is collected through the filter screen into the stainless steel sink and discharged through the sewage pipe. After the raw material becomes smaller, it is discharged through the slag discharge pipe, which greatly reduces the net weight and capacity of scale slag and other dirt. The screw press consists of a sewage pipe area, a feeding area, a screw transport area, and a feeding area. The grid slag enters the feeding area, is compacted in the compaction area by the screw press, the grid slag is discharged, and the sewage is introduced into the seepage pipe from the grid bar.